Thursday, April 11, 2013

Keeling Time

The first layer of the keel is epoxied and screwed on to the frames.   The strength seems amazing, and with one more solid piece of oak (doubling the keel thickness) it will be super strong.   The overall thickness will be over 2 inches before the planking and the skeg.   The next step is to install the second layer of the keel, and build the stem.  

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.